High vessel loading speed
Loading time for one tanker ship with a carrying capacity of 6000 tons only 12-14 hours
Pumps with a capacity of 200-330 m³/h
Two EMCO marine loading arms with a capacity of 750 m³/h each for a reliable and flexible connection between the jetty and the vessel
Separation system for different types of products
All the cargos are insured against the risk of mixing or corruption.
Pipe rack equipped with two independent lines having the diameter of 350 mm
Two independent lines for storage and loading (two groups of tanks, pumps and pipes)
Pipe line pigging system for quick removal of the product residue
Two collectors at the railway ramp for simultaneous discharge
Discharge of up to 90 railway tanks per day
Simultaneous parking of up to 80 railway tanks
Our own locomotive for quick freeing of the tracks and acceptance of the next batch of railway tanks
Discharge ramp that makes it possible to discharge up to 5000 tons per day
We own access railway tracks – cumulative track set